表彰会校长发言稿:请大家帮忙翻译一段电脑专业术语
来源:百度文库 编辑:神马品牌网 时间:2024/04/29 02:02:58
Ground the level of the secluded ground dam and the supervision of the perpendicular direction always is depend on artificial to carry on on-the-spot diagraph, since inconvenient again have an error margin.For resolving this problem us to design a long range data of big dam to collect with supervision system.The system passes to grind 华 second be a mold piece at native collect the liquid data which changes to send to machine and level to move one to account, spread to native calculator or long range calculator through the RS485 total line.(grind 华 work to control machine)Native or the long range compute on board designed specialized supervision to collect interface, the customer canned carry on enactment to the process, communication mode...etc. of passage, control for collecting according to the different circumstance.Data of collecting's putting a database can be at any time adjusted by customer to use.Carried out a big dam long range data to collect thus with the automation supervised and controled