finally finish shrinkage fitting parts of mark “A” based on I.D. and roughly machine the rest.
Static unbalance on periphery of roll to be less then 150g before shrinkage fit.
Before shrinkage fit,finally finish shrinkage fitting parts of marks”B”and “C” and roughly machine other parts.
Shaft dia of marks”B” and “C” to be decided so that inter.
Ference of shrinkage fit is 0.09~0.025 after measuring I.D for mark”A”.

最后在I.D的基础上,完成收缩A记号的配件,然后大概的加工(制造)下剩余的即可.

外部卷状物上的静力(静电噪声)在收缩前需要少于150克

在收缩前,完成B记号和C记号部分的收缩,然后再大概的加工下其他的部分.

B记号和C记号的轴直径需要被确定,这样才能被埋在里面.

在给A记号评估I.D后,收缩的间隔是0.09-0.025

(这应该还有张图吧,因为十分的专业性,所以就大概的翻一下,没有图比较难翻译0