302医院王业东主任简介:请高手帮忙修改下英文!!很着急拜托了 相信10分钟能改完

来源:百度文库 编辑:神马品牌网 时间:2024/04/23 19:25:17
摘 要
该设计为潜孔式平面事故闸门,闸门处孔口尺寸 最大工作行程 ,闸门设计水头 ,平时闸门存放在门库内,该闸门采用下游止水,闸门分为两节主梁位置可按等间距来布置,梁格采用复式布置和梁高连接。

关键词:
潜孔式,事故闸门,止水

Abstract
This design for dives the hole type plane accident strobe, Strobe place manhole size biggest power stroke , strobe design flood peak , usually the strobe deposits in the gate storehouse, this strobe uses the downstream to stop the water, the strobe divides into two king post positions to be possible according to and so on the spacings to arrange, the lange brand uses the multiple arrangement and Liang connects high.

Keywords: Hole-hidden, Emergency Gate, water seal

梁格 ,梁高

Beam space ,The beam is high

(把下面3个英语关键词加到下面的英语摘要文章里,英语摘要翻译的不好 哎~~ ,把梁格 ,梁高也加进去适当的地方) 在线等~~~
就把3个关键词替换英语摘要里的相应词就行 ,这是毕业论文摘要 希望能认真修改 谢谢

帮你修改了语法错误和加入那几个单词, 但有些专业的地方我不能肯定, 大致意思应该对吧
Abstract
This design supports the Hole-Hidden type Emergency Gate, gate's exterior hole opening measurement, largest work process, and flood peak gate design. The gate is usually stored in the gate storehouse and uses downstream flow to acheive water seal. The gate is divided into two major sections of beam placement and they can be placed with equal spacing arrangement. The beam space uses mulitple arrangement placement to connect with high beam.